Solar farm

Cuellar, Segovia
02/23/2023
Turnkey project of a 1 MW photovoltaic solar installation for sale to the grid, executed by SII in Cuellar, Segovia.
The installation consists of:

  • 2,988 330 W polycrystalline solar modules
  • Galvanized metal structure, driven into the ground
  • 2 500 kW inverters
  • 1,250 kVA transformation CT

The generation estimates for the facility are:

  • 1,400,000 kWh of estimated annual generation
  • 520,000 kg of CO2 stopped being emitted into the atmosphere

Solar self-consumption

Industrial self-consumption
03/07/2023
Grupo Cadielsa, distributors of electrical equipment, air conditioning and water, at its headquarters in León, starts up a 100 kW solar installation for self-consumption by SII.

The solar installation, located on the roof, is made up of 286 monocrystalline modules of 455 W each, two 50 kW inverters, using an aluminum structure to hold the solar modules.

With this facility, Grupo Cadielsa will achieve:

  • 160,000 kWh of estimated annual generation
  • 60,000 kg of CO2 stopped being emitted into the atmosphere

Solar self-consumption

Industrial self-consumption
03/22/2023
Grupo Cadielsa, distributors of electrical equipment, air conditioning and water, in another of its headquarters, this time in Benavente, starts up a 100 kW solar installation for self-consumption by SII.

The solar installation, located on the roof, is made up of 288 monocrystalline modules of 455 W each, two 50 kW inverters, using an aluminum structure to hold the solar modules.

With this facility, Grupo Cadielsa will achieve:

  • 160,000 kWh of estimated annual generation
  • 60,000 kg of CO2 stopped being emitted into the atmosphere

Solar self-consumption

Industrial self-consumption
04/24/2023
CORTES METALÚRGICOS OVIEDO S.L. (CMO) a company located in Valladolid, which is dedicated to cutting, transforming and finishing metallurgical parts, starts up the first phase of a 300 kW photovoltaic solar installation for self-consumption by SII.

Said solar installation is made up of 840 monocrystalline modules of 455 W each, five 60 kW inverters, all mounted on a metallic structure on the roof of some of its owned warehouses.

With this installation, CMO, you will get:

  • 360,000 kWh of estimated annual generation
  • 165,000 kg of CO2 stopped being emitted into the atmosphere