Villanueva del Campo
(Valladolid, España)
01/08/2008
25 kW Low Voltage photovoltaic solar installation, consisting of 126 215 Wp modules and a 25 kW inverter
Villamediana
29/10/2010
Installing 100 kW solar photovoltaic Medium Voltage, composed of 528 modules of 215 Wp and 100 kW inverter
Olmedo
(Valladolid, España)
01/08/2008
Installing 400 kW solar photovoltaic Medium Voltage, 2,016 comprised of 215 Wp modules and four inverters of 100 kW
Geria
(Valladolid, España)
11/02/2008
Installing 100 kW solar photovoltaic Medium Voltage, composed of 504 modules of 215 Wp and 100 kW inverter
Fuente Olmedo
(Valladolid, España)
01/08/2008
Installation of 280 kW solar photovoltaic Medium Voltage, 1,428 comprised of 215 Wp modules, two inverters of 100 kW and two 40 kW inverter
Fresno el Viejo
(Valladolid, España)
22/05/2008
Installing 100 kW solar photovoltaic Medium Voltage, composed of 504 modules of 210 Wp and 100 kW inverter
Ciguñuela
(Valladolid, España)
01/07/2008
Installation of 300 kW solar photovoltaic Medium Voltage, 1,512 comprised of 215 Wp modules and three inverters of 100 kW
Cevico de la Torre
(Palencia, España)
01/08/2008
Installation of 200 kW solar photovoltaic Medium Voltage, 1,008 comprised of 215 Wp modules and two 100 kW inverters
Ceinos de Campos
(Valladolid, España)
20/08/2007
Installing 100 kW solar photovoltaic Low Voltage, composed of 504 modules of 210 Wp and 100 kW inverter
Becilla de Valderaduey
(Valladolid, España)
03/06/2013
With a total power of 4,700 kW installations.
Acisa de las Arrimadas
(León, España)
03/06/2013
With a total power of 4,700 kW installations.